Client: Taiwan Area National Freeway Bureau
Engineer: T.Y. Lin International
Location: Yuanshan, Taipei
Year of Completion: 1977
Type of Work:
Prestressed concrete cantilever bridge, 1,452m length X 35m width, main spans 150m long, North Approach Bridge 525m, South Approach Bridge 256m
Structure:
Precast, prestressed concrete beams, and cast-in-place prestressed concrete box girder