Client: Taiwan Area National Expressway Engineering Bureau, MOTC
Engineer: China Engineering Consultants, Inc.
Location: Jenwu, Kaohsiung
Year of Completion: 1997
Type of Work:
Precast, prestressed concrete elevated bridge of 5,556m in length X 29m to 42m in width, upper and lower ramps of 200m in length X 6.6m in width
Structure:
Precast segmental bridge with balance cantilever construction