Projects

Client:  East District Project Office, Department of Rapid Transit Systems, ECG

Engineer: China Engineering Consultants, Inc.

Location: Tachih, Taipei, Taiwan

 

Type of Work:

Station:– Two story MRT underground station 163m in length x 22m in width

Tunnel: Twin bored tunnel with outer diameter of 5.6m constructed by TBM method, the minimum curvature radius R of 140m, total track length of 5901m.

Save

Save

Save

Save