Client: East District Project Office, Department of Rapid Transit Systems, ECG
Engineer: China Engineering Consultants, Inc.
Location: Tachih, Taipei, Taiwan
Type of Work:
Station:– Two story MRT underground station 163m in length x 22m in width
Tunnel: Twin bored tunnel with outer diameter of 5.6m constructed by TBM method, the minimum curvature radius R of 140m, total track length of 5901m.