Client: Department of Rapid Transit System Eastern District Project Office, TCG
Engineer: Sinotech Engineering Consultants, Inc.
Location: Chung Hsiao East Road., Sec. 4, Taipei
Station: RC., diaphragm wall of 1 m thick, 34m deep
Year of Completion: 1996
Type of Work: MRTS underground station, 256m in length X 21.9m in width, two-story underground, twin-bored tunnel constructed by shield machine, outer diameter of 5.9m, total track length of 1,920m
Structure:
Tunnel: Precast concrete lining