Projects

Client: Department of Rapid Transit System Eastern District Project Office, TCG

Engineer: Sinotech Engineering Consultants, Inc.

Location: Chung Hsiao East Road., Sec. 4, Taipei

 

Station: RC., diaphragm wall of 1 m thick, 34m deep

Year of Completion: 1996

Type of Work: MRTS underground station, 256m in length X 21.9m in width, two-story underground, twin-bored tunnel constructed by shield machine, outer diameter of 5.9m, total track length of 1,920m

Structure:
Tunnel: Precast concrete lining