Client: Delhi Metro Rail Corporation Ltd.   

Engineer :Tondon Consultant Private Limited

Location: Noida-Greater Noida, India

Commencement Date: 25th May, 2015

Completion Date: 25th May, 2017

Project Name: Part Design and Construction of Elevated Viaduct and 7 elevated stations viz. Sector 142, Sector 143, Sector 144, Sector 147, Sector 153, Sector 146 and Sector 149 including architectural finishing works of stations from chainage 9129.8 m to 19322.9 m of Noida-Greater Noida Metro Project.

Scope Of Work :
 
Viaduct :  10.193 Km (Design by Contractor except superstructure at Standard span)
Stations : 7 Stations each of 140 m length (Design by DMRC)
Foundations : (1000 mm dia minimum) Design by Contractor
Substructure :  Pier (circular pier of minimum dia of 1800mm) / Pre-Cast Pier Cap
Superstructure : U-Girder for Standard span : Design by DMRC
                           U-Girder / I-Girder / Parapet for Special span : Design by Contractor
 
Joint Venture: A Joint Venture with SAM India with CEC as the Lead Memeber 