Client: Division of New Construction Projects, Taipei City Government
Engineer: China Engineering Consultants, Inc.
Location: Keelong River (near Nanking E. Rd., Sec. 5)
Structure:
Foundations & Columns (Only both river side) are R.C. Columns (others) & arch-bridge are steel structure. Use fixed gantry skid derrick method to fitting-up the block beams
Total weight of steel material: 11,862T.
Year of Completion: 2000
Type of Work: Double decks single tired arch bridge, Arch rise 50m, arch span 170m, total length 340m, Upper-deck one way two lanes , Lower-deck one way three lanes