Client: Department of Rapid Transit System Central District Project Office, TCG
Engineer: De Leuw Cather International, Inc. Sinotech Engineering Consultants, Inc.
Location: Hoping West Rd., Sec. 3 Taipei
Year of Completion: 1996
Type of Work:
MRTS underground station, 372m in length X 21.9m in width, 2-story underground, twin-bored tunnel constructed by 2 shield machines; outer diameter of 6.1m, total track length of 3,296m
Structure:
Station: R.C. Diaphragm wall of 1.2m thick, 52m deep Tunnel: Precast R.C. lining