Client: Delhi Metro Rail Corporation Ltd. Contract BC-16
Engineer: China Engineering Consultants Incorporation (CECI)
Location: New Delhi, India
Year of Completion: 2010
Type of Work: Design and Construction of Tunnels by Shield TBM (Tunnel Boring Method) and Station by Cut & Cover method between Udyog Bhawan and Green Park Stations for underground works on Central Secretariat - Qutub Minar Corridor of Phase II of Delhi MRTS
Tunnel : 4x2 kms (Twin Tunnels) bored with 4 Shield TBMs; Finished diameter- 5.8 meters No. of Stations 4 Underground Stations at Race Course, Jor Bagh, INA and AIIMS.
Total Value: INR 904.84 Crore
Joint Venture A Joint Venture with SOMA India with CEC as the Lead Member and responsible for all major works.